Design is a business decision, not just an aesthetic one. Every line on every drawing is justifiable on commercial terms — or it doesn't go on the drawing.
Space planning, material selection, custom millwork drawings, lighting specification, finish schedules. Our drawings are buildable on day one — not the kind your contractor calls about.
Construction documents, material spec book, FF&E schedules, lighting plans.
8–14 weeks from kickoff
Furniture, fixtures, and equipment — we own the whole chain. Vendor relationships built over a decade mean trade pricing you don't get yourself, and lead times we can actually defend.
Specified, ordered, tracked, delivered, and installed — all under one PO.
Concurrent with construction
Things go sideways at execution. We catch substitutions before they're installed, review change orders before you sign them, and run the punch list so opening day isn't a surprise.
Weekly site visits, change order review, photo updates, opening punch.
Through certificate of occupancy
For franchises and growing groups: a master design system with adaptation rules. Your fourth location costs less, opens faster, and looks more like your brand than your first one did.
Kit-of-parts spec book, vendor playbook, location-specific adaptation plans.
Per-location, with master 4–6 weeks
We're often asked to take on adjacent work. We say no — for the same reason a good restaurant doesn't add a 200-item menu.